Warning: stripos() expects parameter 1 to be string, array given in /home/porfan/public_html/wp-includes/formatting.php on line 3792

For the past few months, Porfan Metalwork LTD has been doing work behind-the-scenes in its Uxbridge facility that would mean a significant improvement to our lead-time and our pricing of fabrications. In our Uxbridge facility a powder coating workshop is being constructed and is due to be in use before the year is out. This workshop will do away with our added weeks lead time by discarding the need to send the fabrications away. It will also lead to decrease costs for you as our own costs of fabrications would be reduced and we can pass these savings on you.